Accessibility Contact Us
000 for fire or life threatening emergencies
132 500 for SES emergency assistance
13 DFES (13 3337) for emergency information
General enquiries Hearing or speech impaired contacts
Home Publications Links Contact Us

Fire Safety Engineering Report Assessment

Home Regulation and Compliance
Building Plan Assessment
Fire Safety Engineering Report Assessment

Documentation lodged with DFES as required by Building Regulations 2012 (as amended), may include a Fire Engineering Brief (FEB) and/or a Fire Safety Engineering Report (FSER) where alternative building solutions are proposed.

DFES may support an application for an alternative building solution that meets conditions as outlined in GL-15 Fire Safety Engineered Performance Solutions. However prior to discussions with DFES, applicants are advised to consult the relevant local government building department or other permit issuing authority.

All FEB’s and FSER’s submitted to DFES must be lodged using the following Electronic Lodgement Form DFES Plan Lodgement Form.

Important Information
March 2017
Please click here to access the revised Hydrant Booster and Pre-Test Requirement Form.
In order to submit the form you are required to have the latest version of the Adobe Reader. Please download the latest free version of Adobe from the Adobe website.
© 2021 Government of Western Australia. All rights reserved.